Emergency at Pavlodar Power Plant: Two Workers Seek Medical Help
Photo: pavlodarenergo.kz
A pipeline lost pressure during the startup of equipment at Boiler Unit No. 5 at Pavlodar CHP-2, producing a loud bang, Orda.kz reports.
At the time, workers were carrying out major repairs at the neighboring Boiler Unit No. 4.
One contractor said the noise had affected his hearing. Another reported ankle pain after leaving the work area. Both workers were examined at a medical facility and released home.
The station said the operation of its equipment remained under control.
Original author: Oksana Matviyenko
Read also:
Latest news
- Kazakhstan’s Credit Rating Upgraded for First Time in a Decade
- While Thousands Lost Power, KEGOC Executives Received Nearly Half a Billion Tenge
- Changi Airport Group May Help Build Astana’s New Airport
- US Again Extends Deadline for Lukoil to Sell Its Assets in Kazakhstan
- Kazakhstan Extradites Business Manager From Russia in 290 Million Tenge Tax Case
- Released Amur Tiger Successfully Hunts in Kazakhstan’s Wild
- Kazakhstan Moves to Develop Critical Minerals as Global Competition Intensifies
- Another Performance by Kazakh Stand-Up Comedian Called Off
- Uzbekistan Begins Preparations for Second Nuclear Power Plant
- Backpack Links Glacier Remains to Man Missing for 19 Years
- 650-Hectare Wildfire Contained in Karaganda Region
- Unusual Wildlife Encounter Captured in Altyn-Emel
- Retired Border Service Dog Sold for $2 at Kazakhstan Auction
- Will Kazakhstan Have Enough Coal This Winter?
- Belarusian Hikers Find Body on Glacier Near Almaty
- Kazakhstan Investigates Spending on 242 Million Tenge Educational Game
- Kazakhstan Makes Caspian Oil Companies Pay for Counterterrorism Deployments
- Kazakhstan Faces Shortage of 245,000 School Places
- Waste Dumping Reported Near Yurt Camps at Lake Zaisan
- Kazakh Oil Rerouted to Novorossiysk as Russia Frees Baltic Export Capacity